Jalamrut Water Treatment

Jalamrut Water Treatment water and waste water treatment company. no additional information
(1)

11/09/2026

Is Your ETP Running Continuously but COD Is Still Not Coming Down?

Running your ETP continuously does not always mean you are getting the right treatment performance.

High COD at the outlet can be caused by several factors:

Incorrect chemical dosing
Poor equalization of wastewater
Improper pH control
Biological treatment problems
Low or excessive DO
Incorrect MLSS/MLVSS balance
Poor sludge condition
Variation in inlet wastewater characteristics

18/08/2026

Sludge Carryover in Clarifier – Why Does It Happen? @

Is sludge coming out with the treated water from your clarifier?

This is called sludge carryover, and it can seriously affect the quality of your treated water.

🔹 Common reasons:
• Excessive sludge accumulation
• Improper sludge withdrawal
• High sludge loading
• Poor floc formation
• Hydraulic overloading
• Short-circuiting in the clarifier
• Incorrect return sludge / wasting rate

17/08/2026
17/08/2026

Case study of river water handling in rainy and summer season. We successfully design and commissioning the plant. water

06/08/2026

In this video we are discussed about the water treatment and water recycling of our customer recycling

Why the Sewage Treatment Plants fail to give the good water quality ?Majorly 5 reasons I found 1) Lack of knowlege of op...
11/07/2026

Why the Sewage Treatment Plants fail to give the good water quality ?

Majorly 5 reasons I found
1) Lack of knowlege of operation
2) Wrong Design
3) Increase the capacity of inlet water
4) Bacterial development problem
5) irregular maintenance.

customer do not know about the above things. if as a expert we give him knowledge we will recycle the 100 % water.

Hello friends, Today I want to share one experience of our customer. He use the raw river water for his resort. In the m...
10/07/2026

Hello friends, Today I want to share one experience of our customer. He use the raw river water for his resort. In the month of may river is completely dry so he used the store water of the river which is completely sluggish water and in rainy season river is fully overflowed but is it completely turbid. both water conditions are different. we give him best solutions for his specific requirement. if you are facing any this type of challenges regarding water and waste water. contact us . [email protected]. or +91 9321225990

Same Problem ????In India around 90 % of the STP (Sewage Treatment Plant) not working as per design parameters or as per...
24/06/2026

Same Problem ????

In India around 90 % of the STP (Sewage Treatment Plant) not working as per design parameters or as per capacity.
Due to the lack of knowledge/experience many of the STP plants not working properly and not giving outlet parameters, ultimately end user suffer the issues of dirty water/black/brown water in the flushing system.In many cases I had seen the small bacterial contamination also present in the outlet water. Many of the vendors ask you "SIR, ABHI THIK KARKE DETA HU". but they not able to give you good results.

All above problems solution here, we have the 15 years of experience in the industry and solving many water problems with correct water balance of your system and give proven results. we always ready to help you to treat your water and wastewater.

Call us - +91 9321225990 email - [email protected] website - www.jalamrut.com

Many industries experience frequent RO membrane replacement, sometimes every year. This may sound like a routine mainten...
21/06/2026

Many industries experience frequent RO membrane replacement, sometimes every year. This may sound like a routine maintenance activity, but the actual cost impact is significant — RO membranes can contribute to nearly 40–50% of the total RO plant cost and directly increase your OPEX.

At Jalamrut, we focus on improving your existing RO plant efficiency, increasing recovery, reducing membrane fouling, and optimizing overall water treatment performance.

Let us help you reduce your operational cost and maximize your RO plant performance.

📞 Contact us: +91 9321225990
✉️ Email: [email protected]

Address

Kalyan

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+919867505663

Alerts

Be the first to know and let us send you an email when Jalamrut Water Treatment posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Jalamrut Water Treatment:

Shortcuts

Share