24/06/2026
Another major project completed for a privately owned industrial estate.
This job involved the installation of approximately 1.5km of 125mm HDPE pipe for the new water main and fire main network, with all joins professionally fusion welded to ensure a strong and reliable system.
The project also included the installation of 5 dual hydrants throughout the estate to complete the fire protection infrastructure.
Another top quality result delivered by the team, with excellent workmanship from start to finish.