10/04/2026
Before & After: SPECK Pump Upgrade Complete!
Another pump upgrade complete. The old metal pumps were removed, along with the 10” and 8” fiberglass wyes, and the mains were re-piped using Schedule 80 PVC tees.
Each pool’s double-pump heat system was replaced with a single pump for a cleaner, more streamlined setup. Lug-style valves were also added to the surge tank connections to improve serviceability.
To help protect the new system, seismic-style pipe support systems were installed to reduce stress on the piping and pumps.
A complete upgrade for improved serviceability, support, and long-term performance.