09/28/2026
Heads up! 🎬 This may affect your ability to visit us tomorrow, Tuesday, Sept 29th, so just something to keep in mind if you’re planning to pop by! We will be OPEN and excited to maybe see some of the action! 🪺
How fun! 🤩 Sullivan's Crossing is a great show, if you haven’t watched it yet, definitely check it out! 🤎
Sullivan’s Crossing will be filming on Gerrish Street, at Tatum’s Bridal Fashions, on Tuesday, October 29. The production team began arriving over the weekend to start set design and preparations.
SCHEDULE
Sunday, September 27
• Trucks and trailers park at the Hants Aquatic Centre lot.
• Base camp will be located at the Windsor Curling Club.
Monday, September 28
• Crew will be downtown preparing for interior and exterior filming.
• Smaller tech trucks will be parking in the lot behind Pharmasave and Tatum’s.
• There will be some larger trucks parked on Water Street, across from the Waterfront Mall.
Tuesday, September 29
• 6:00 am – Crew will begin arriving on Gerrish Street
• 7:00–9:00 am – Intermittent traffic stoppages will be implemented on Water Street and Gerrish Street.
• Traffic will be temporarily held for short periods, rather than rerouted, with a maximum stoppage of three minutes.
• The first scene filmed will be on the sidewalk at the corner of Water and Gerrish Streets.
• Exterior filming will conclude at 9:00 am. Filming will continue inside Tatum’s Bridal Fashions until the end of day.
• Filming will conclude early evening.
Thursday, October 1 - Crew will return for final clean-up.
Thank you to residents, businesses, and visitors for your patience and cooperation while filming takes place in downtown Windsor.