21/10/2026
Rees has hopped in his car to show you how to get to the farm with the new road layout as the bridge works enter their next phase.
While you do still need to head all the way up to the Highnam roundabout if you are visiting us from Gloucester or Cheltenham, turning into the farm on your way back down is now a lot easier.
For those of us travelling to us by public transport, the bus stop from the city has moved down to opposite the shop, and the bus stop coming from the forest has moved back to its permanent spot by Horseshoe Drive and the Lock Keepers.
For all of the latest roadwork updates and to check our cameras before you travel, head over to our website: https://www.overfarm.co.uk/a40-over-bridge-roadworks/