New Concrete Driveway- Excavated existing driveway and removed off site.- Stoned to level with Type 1 granite - Over 50 ...
23/04/2026

New Concrete Driveway

- Excavated existing driveway and removed off site.
- Stoned to level with Type 1 granite
- Over 50 cube of concrete poured with a brush finish.

Thanks to Ready Crete LTD for the concrete.

Groundworks, Operated Plant and Haulage.

Mike - 07834173368

It has been a busy few weeks re-grading tracks in and around East Yorkshire whilst the weather has been on our side. If ...
19/04/2026

It has been a busy few weeks re-grading tracks in and around East Yorkshire whilst the weather has been on our side.

If you have a potholed track that needs re-grading let us know.

Groundworks, Operated Plant and Haulage

Mike - 07834173368
[email protected]

Brand new 2.6 Tonne JCB added to the fleet. Thanks to Pete Smith at TC Harrison JCB for the new machine. Put straight to...
20/03/2026

Brand new 2.6 Tonne JCB added to the fleet.

Thanks to Pete Smith at TC Harrison JCB for the new machine.

Put straight to work on a new horse arena we are building.

Groundworks and Haulage

Mike - 07834173368

South Cave Car Park Extension - Area excavated and 350 tonne of spoil removed off site. - Land drains installed - 150mm ...
17/03/2026

South Cave Car Park Extension

- Area excavated and 350 tonne of spoil removed off site.
- Land drains installed
- 150mm of type 1 stone levelled and compacted.
- Topped with 60 tonne of 20mm limestone.

All materials moved with our own lorry.

Operated plant and Haulage.

Mike - 07834173368

New Concrete Yard Entrance. - Whole are excavated and removed off site. - 200mm Type 1 stone levelled and compacted - Co...
02/03/2026

New Concrete Yard Entrance.

- Whole are excavated and removed off site.
- 200mm Type 1 stone levelled and compacted
- Concrete shutters put in place.
- 10mm steel mesh installed.
- 90 + cube of C40 concrete laid with a brush finish.
- Drain installed around the out side.

Thanks to Ready Crete LTD for the concrete.

Groundworks, Operated Plant and Haulage

Mike - 07834173368

Yard Extension - - Concrete bollards removed - Area excavated  - 40 tonne of type 1 granite levelled and compacted. - To...
09/02/2026

Yard Extension -

- Concrete bollards removed
- Area excavated
- 40 tonne of type 1 granite levelled and compacted.
- Topped off with 40mm lime stone.

All materials moved in and out with the lorry.

Groundworks, operated plant and haulage

Mike - 07834173368

Concreting and re-stoning a yard. - Yard excavated and spoil removed off site - Stoned back up with type 1 granite - 45m...
01/02/2026

Concreting and re-stoning a yard.

- Yard excavated and spoil removed off site
- Stoned back up with type 1 granite
- 45m of ACO drains installed
- 320 square metres of concrete laid, with a brush finish and 10mm steel mesh.
- 120 Tonnes of 40mm limestone levelled and compacted over the rest of the yard.

Groundworks, Operated Plant and Haulage

Mike - 07834173368

Cambridge - Groundworks for solar and battery storage - site prep, foundation installation and electrical ducting.  - 2 ...
18/01/2026

Cambridge -

Groundworks for solar and battery storage - site prep, foundation installation and electrical ducting.

- 2 x twin wall ducts 180 metres long installed.
- Covered in sand, electric tape and back filled
- Concrete pads excavated and prepped to specification
- 5 cube of concrete poured

Groundworks and haulage.

Mike - 07834173368

01/01/2026
Last job of the year completed at a caravan park. - 900 tonne earth bank removed off site. 🚚🚚🚚Wishing all our customers ...
21/12/2025

Last job of the year completed at a caravan park.

- 900 tonne earth bank removed off site.
🚚🚚🚚

Wishing all our customers a Merry Christmas and a Happy New Year.

East Yorkshire - Call out to a Wind Turbine Site The river had breached its banks and flooded the base of a wind turbine...
15/12/2025

East Yorkshire - Call out to a Wind Turbine Site

The river had breached its banks and flooded the base of a wind turbine.

We provided tractors and tankers to clear the water ready for the engineers to fix the turbine.

Groundworks, operated plant and aggregate haulage.

Mike - 07834173368

Address

Beaconfield Farm
Patrington
HU120PS

Opening Hours

Monday 7am - 7pm
Tuesday 7am - 7pm
Wednesday 7am - 7pm
Thursday 7am - 7pm
Friday 7am - 7pm
Saturday 7am - 7pm
Sunday 7am - 7pm

Telephone

+447834173368

Alerts

Be the first to know and let us send you an email when Meadley Groundworks and Haulage posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category