08/07/2025
✅ "Roof waterproofing process"
1. Surface Preparation
→ Cleaning the roof surface thoroughly to remove dust, debris, and loose particles.
2. Crack Filling (if needed)
→ Filling visible cracks with crack filler or sealant.
3. Primer Application
→ Applying a suitable primer to enhance adhesion of the waterproofing layer.
4. Mesh Laying (Net Installation)
→ Laying fiberglass or polyester waterproofing mesh (e.g., 45 GSM or specific thickness) over the entire roof.
5. First Coat Application
→ Applying the first layer of waterproofing chemical or coating material (e.g., acrylic/polyurethane/bitumen-based).
6. Second Coat Application
→ After drying, applying a second coat for added strength and durability.
7. Final Curing
→ Allowing the coating to cure/dry completely before use.