K & S Ag Repair LLC

K & S Ag Repair LLC Repair, remodel, and new equipment install in hog confinement building.

72 X 20 compost building up this week. Just weighting on trim to come in
09/18/2021

72 X 20 compost building up this week. Just weighting on trim to come in

Another load chute finished up
09/15/2021

Another load chute finished up

09/04/2021
With a week of delays do to not having parts. The 5000 hd nurswas finished today.
08/07/2021

With a week of delays do to not having parts. The 5000 hd nurswas finished today.

Chimney replacement, AP 24"
08/04/2021

Chimney replacement, AP 24"

Getting started on a new nursery this week.
07/13/2021

Getting started on a new nursery this week.

3 barns of new feeders put in this afternoon.
04/28/2021

3 barns of new feeders put in this afternoon.

Getting some slats changed out.
04/15/2021

Getting some slats changed out.

New curtain going on with Stainless Steel bird wire.
04/08/2021

New curtain going on with Stainless Steel bird wire.

Gate replacement, using SDI gating. Stainless Steel posts and feet.
04/03/2021

Gate replacement, using SDI gating. Stainless Steel posts and feet.

Thorp Stainless Steel gating replacement in Natural Building.
03/26/2021

Thorp Stainless Steel gating replacement in Natural Building.

Gate replacement in a deep pit barn. Thorp Stainless Steel gating
03/26/2021

Gate replacement in a deep pit barn. Thorp Stainless Steel gating

This barn will take a little longer to get cleaned out. This is one of the fastest ways to plug lines and stop a scraper...
10/10/2020

This barn will take a little longer to get cleaned out. This is one of the fastest ways to plug lines and stop a scraper in it track

10/10/2020

No better sound than a screaming scraper coming down the barn

Getting a jump on a remodel. All new gas lines on the brooders, and heaters. Complete curtain replacement ( all SS hardw...
10/08/2020

Getting a jump on a remodel. All new gas lines on the brooders, and heaters. Complete curtain replacement ( all SS hardware and bird netting). And everyone's favorite, complete clean out of the pits, then replace parts as needed.

New Stainless Steel hardware and birdnetting going up
10/01/2020

New Stainless Steel hardware and birdnetting going up

New gas lines and brooders
09/25/2020

New gas lines and brooders

First 400 ft of curtain, bird wire, and hardware of the season completed.
09/23/2020

First 400 ft of curtain, bird wire, and hardware of the season completed.

Few sheet of end steel and trim work and another set of hallways and load chutes done
09/20/2020

Few sheet of end steel and trim work and another set of hallways and load chutes done

Upgrading to actuated inlets and adding a couple 24" and 36" wall fans
09/03/2020

Upgrading to actuated inlets and adding a couple 24" and 36" wall fans

Framing done and steels going up.
06/26/2020

Framing done and steels going up.

Getting load chutes and hallways framed up. Wind needs to stop so we can get steel on
06/17/2020

Getting load chutes and hallways framed up. Wind needs to stop so we can get steel on

Gates and feeder replacement started
05/28/2020

Gates and feeder replacement started

Controllers and inlets in
05/28/2020

Controllers and inlets in

Moving to actuated inlets
05/22/2020

Moving to actuated inlets

One more pore and concrete work is done.
05/22/2020

One more pore and concrete work is done.

Pumping water and framing up
05/20/2020

Pumping water and framing up

Another load chute bites the bust to make room for a concrete one.
05/13/2020

Another load chute bites the bust to make room for a concrete one.

Dirt work is done, now to get concrete pored.
05/12/2020

Dirt work is done, now to get concrete pored.

Prep work for permanent load chutes going up.
05/05/2020

Prep work for permanent load chutes going up.

Putting new end on gates
04/22/2020

Putting new end on gates

Gate replacement job completed. Tip to clean feeders and no bolting to the walls.
03/17/2020

Gate replacement job completed. Tip to clean feeders and no bolting to the walls.

Starting a 2 barn gate replacement this week
03/10/2020

Starting a 2 barn gate replacement this week

Feed line upgrades
02/05/2020

Feed line upgrades

New brooder lines going in
01/24/2020

New brooder lines going in

Address

515 S Harriet Street
Algona, IA
50511

Telephone

(712) 229-7888

Website

Alerts

Be the first to know and let us send you an email when K & S Ag Repair LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to K & S Ag Repair LLC:

Videos

Share

Category


Other Farms in Algona

Show All

Comments

K & S Ag Repair is looking for dependable hard working individuals. Work includes repairs, remodels and installation of equipment in hog buildings. Drivers license and transportation is required. Please contact Keith at 712-229-7888.
Looking for dependable hard working individuals. Work includes repairs, remodels and installation of equipment in hog buildings. Drivers license and transportation is required. Please contact Keith at 712-229-7888.
We are currently looking for help. Work involves doing hog barn repairs and retrofits. If you know of anyone or if your looking. Give me a call.

Thanks,
Keith
Excellent Keith let me know if you ever need help.
Just seen an add at the restaurant the other day that there is a guy in Fenton doing the same thing
#}