08/03/2017

Sidetracked Studio finally stepping up the gram game. Come check us out

Tile install underway at our La Grange Project. Things are moving quickly and construction is nearing completion!
07/16/2017

Tile install underway at our La Grange Project. Things are moving quickly and construction is nearing completion!

meanwhile out at the LaGrange Ranch...exterior coming together, interior moving quick. updates to come!
05/19/2017

meanwhile out at the LaGrange Ranch...exterior coming together, interior moving quick. updates to come!

the devil is in the details. corner details.  Tile installation at our Grover Residence.
05/19/2017

the devil is in the details. corner details. Tile installation at our Grover Residence.

Walk-thru at our Preston Ave. remodel/addition yesterday. Up in the trees; no complaints over here.
03/21/2017

Walk-thru at our Preston Ave. remodel/addition yesterday. Up in the trees; no complaints over here.

Framing underway out at the La Grange ranch. Pretty impossible to have a bad view.
03/06/2017

Framing underway out at the La Grange ranch. Pretty impossible to have a bad view.

If we could spend every day out at our La Grange project we would. Even small projects demand big views...and deer, so s...
02/07/2017

If we could spend every day out at our La Grange project we would. Even small projects demand big views...and deer, so so many deer. Foundation poured; gearing up for framing.

framing underway at our Rollingwood Residence!
02/06/2017

framing underway at our Rollingwood Residence!

29th street project moving along. snapped a shot of the new foundation and storage space below the relocated house and t...
12/29/2016

29th street project moving along. snapped a shot of the new foundation and storage space below the relocated house and the historic stair leading up to the second floor. lots of paint stripping and tlc in it's future.

Weekends are for art and architecture.  Second round of schematic design with our clients from Kentucky followed by some...
11/14/2016

Weekends are for art and architecture. Second round of schematic design with our clients from Kentucky followed by some East Austin Studio touring. Big thanks to Sarah and Harvey for making the trip down.

Last week was a big week at our 29th street job site. Junior Brown and his crew moved the historic house from Wichita Fa...
11/01/2016

Last week was a big week at our 29th street job site. Junior Brown and his crew moved the historic house from Wichita Falls TX. The first floor came in 3 pieces on 3 massive trailers. Here you can see the section of house awaiting placement above the basement. Hats off to the guys making this happen.

Foundation in full swing at the Rollingwood job site. Garage slab poured; formwork for Garage wall going up. Looking for...
11/01/2016

Foundation in full swing at the Rollingwood job site. Garage slab poured; formwork for Garage wall going up. Looking forward to pouring the main level in the weeks to come.

Address

Austin, TX
78702

Alerts

Be the first to know and let us send you an email when Sidetracked Studio posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sidetracked Studio:

Share