Kling Sales and Service

Kling Sales and Service 22 acres and a dream. Spring 2018, we hope to be putting up our poles and planting our first hops.

Yay! Windows and a new front door! Picture from when we bought it for comparison.
01/17/2021

Yay! Windows and a new front door! Picture from when we bought it for comparison.

Stripped the front of the rental this summer. New windows and front door have finally arrived for the front. Everything ...
01/17/2021

Stripped the front of the rental this summer. New windows and front door have finally arrived for the front. Everything is slow during the pandemic. Looking forward to being able to add siding and a front patio. Can’t put another porch on because of zoning and required setbacks.

Just as the deluge of rain starts, Mark screws the last piece of plywood on. Done for the weekend!
10/06/2019

Just as the deluge of rain starts, Mark screws the last piece of plywood on. Done for the weekend!

Lunchtime day #2.
10/06/2019

Lunchtime day #2.

The end of day  #1. The old people are tired.
10/05/2019

The end of day #1. The old people are tired.

Lunchtime and the need for some supports to remove the roof safer than it is now.
10/05/2019

Lunchtime and the need for some supports to remove the roof safer than it is now.

This weekend's project... Removal of porch.
10/05/2019

This weekend's project... Removal of porch.

The first pole is in! Needs to be straightened and packed with dirt, but we are on our way!
09/01/2019

The first pole is in! Needs to be straightened and packed with dirt, but we are on our way!

Morning visitors at   This weekend’s total - 205 holes drilled for poles. A solid long weekend of work. Next task is to ...
05/27/2019

Morning visitors at This weekend’s total - 205 holes drilled for poles. A solid long weekend of work. Next task is to raise some poles!

The end of Day  #2. 11 rows drilled total. 0nly 25 more to go! I don't think we'll finish before our full-time jobs want...
05/26/2019

The end of Day #2. 11 rows drilled total. 0nly 25 more to go! I don't think we'll finish before our full-time jobs want us back.

05/25/2019

Three rows of holes in the ground. About half the grid mowed. Not too bad for day #1 with a thunderstorm at the beginning.

05/25/2019

Digging the first holes for our poles.

Address

1539 Rochester Street
Lima, NY
14485

Alerts

Be the first to know and let us send you an email when Kling Sales and Service posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category