08/02/2026
I have to auger holes in the ground to set the 4x6 treated posts that will become the supports and frame of the new addition. Due to the drought the ground is so hard I could only go down about 6 inches. This meant I had to fill the shallow holes with water let it drain into the ground and then refill the holes a couple of times in order to soften the soil up. This worked and I was able to get to the required depth of 42 inches. It doesn’t help that the ground is primarily clay but you got to play the hand you’re dealt. Bottom line is the holes are drilled so construction can begin.