06/06/2026
Our team pulling a pump in a not very big, very uneven compound with a mosquito breeding water pond. The well was then surveyed with a camera to inspect the bore hole and screen. A 24 hour flow test and quality samples were then completed before re-installation of the clients pumping equipment.