18/08/2026
๐๐ฟ๐ผ๐บ ๐ฟ๐ฒ๐ฎ๐ฐ๐๐ถ๐๐ฒ ๐ณ๐ฎ๐ถ๐น๐๐ฟ๐ฒ ๐๐ผ ๐ฐ๐ผ๐ป๐๐ฟ๐ผ๐น๐น๐ฒ๐ฑ ๐ผ๐ฝ๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป: ๐๐น๐ฒ๐
๐ฎ๐ป๐ฑ๐ฟ๐ถ๐ฎ ๐ฆ๐ฒ๐๐ฎ๐ด๐ฒ ๐ฃ๐๐บ๐ฝ ๐ฆ๐๐ฎ๐๐ถ๐ผ๐ป ๐ญ.
In Alexandria, Eastern Cape, Ndlambe Municipality's sewage pump station was failing repeatedly, driven by unstable power supply, electrical vandalism, and ageing equipment operating past its intended life. The result: recurring overflows, emergency call-outs, and mounting regulatory risk.
Sizwe Amanzi's intervention focused on resilience, not replacement: generator-backed power to ride through outages, hardened and relocated electrical components to reduce vandalism exposure, refurbished mechanical equipment, and simplified control logic.
โข Fewer overflows and emergency incidents
โข Improved uptime through prolonged power outages
โข Reduced reactive maintenance call-outs
โข Greater confidence in regulatory compliance
All work was delivered as part of a long-term operations contract, with performance measured against defined KPIs.
๐ฅ๐ฒ๐ฎ๐ฑ ๐๐ต๐ฒ ๐ณ๐๐น๐น ๐ฐ๐ฎ๐๐ฒ ๐๐๐๐ฑ๐: sizweamanzi.co.za/case-studies