10/15/2026
The binder says one thing. The shift says another.
An SOP can be technically accurate and still fail on the floor if it assumes tools that aren't actually stocked, timing that doesn't match a real rush, or staffing that doesn't match the schedule that's actually built. Compliance gaps usually get blamed on the team. Often it's the process design that never got tested against a real Friday.
Before you rewrite the training, walk the actual shift against the actual document and see exactly where they stop matching.