Interfaceh2o Manufacturer and distributor of storm water treatment products, as well as soil erosion and sediment

Industrial site stormwater management carries some of the strictest regulatory requirements of any land use type. Indust...
06/22/2026

Industrial site stormwater management carries some of the strictest regulatory requirements of any land use type. Industrial general permit conditions, EGLE inspection expectations, and the potential for stormwater to contact industrial materials make both the construction phase and the operational phase high-stakes.

When we work on Michigan industrial sites, we approach both phases with the same rigor.

Construction phase: Full sediment control system with FODS trackout control, SedSox, SedCatch inlet protection, and ground protection mats for laydown areas.

Operational phase water quality treatment: Fabco stormwater filtration systems at inlet structures for TSS and pollutant removal. The Preserver at detention outlet structures for energy dissipation and skimming.

Site access and pavement management: Rain Flow heavy-duty ground grids for material staging and secondary access areas. PaveDrain for truck parking and maneuvering areas where infiltration requirements apply.

Dewatering and waste management: WaterMatrix for contaminated water treatment. Power Pellets for liquid waste solidification.

Emergency flood protection: Muscle Wall for facility flood protection in flood-risk areas.

Industrial stormwater management is not simple. We have the product portfolio and the field experience to support it.

Contact us at https://interfaceh2o.com/

Fatherhood is built through countless everyday moments: showing up for games, projects, conversations, hard days, and ce...
06/19/2026

Fatherhood is built through countless everyday moments: showing up for games, projects, conversations, hard days, and celebrations.

Happy Father’s Day to every dad and father figure who continues to be present, dependable, and deeply appreciated.

Sometimes you just need someone to verify things before you pour or backfill. We are there when it matters most.One last...
06/17/2026

Sometimes you just need someone to verify things before you pour or backfill. We are there when it matters most.

One last look can save a lot of time. We will handle it.

https://interfaceh2o.com/

Large residential developments are subject to significant stormwater permit requirements, and the stormwater management ...
06/16/2026

Large residential developments are subject to significant stormwater permit requirements, and the stormwater management systems need to perform through the entire construction phase as well as for the life of the community.

When we work on residential development projects, we support both phases.
Construction phase: FODS trackout control at all site entrances. SedSox and SedCatch inlet protection throughout the grading and infrastructure phase. Ground protection mats for utility installation in wet areas.
Post-construction stormwater management: PaveDrain for guest parking areas, cul-de-sacs, and open space parking. Fabco stormwater filtration at inlet structures. FocalPoint biofiltration in community green space areas where volume and water quality credits are needed.
Sustainable community amenity construction: OmniBlock for community building construction. LumberCon for walking paths, trails, and accessible routes throughout the community.
Landscaping and vegetation management: Century Root Barrier for street tree installations in sidewalk and curb zones.
Contact us to discuss your development project: https://interfaceh2o.com/

From concept to construction, stormwater management is not a single decision. It is a sequence of decisions made by mult...
06/12/2026

From concept to construction, stormwater management is not a single decision. It is a sequence of decisions made by multiple people across multiple phases of a project.

We understand that sequence. We know where engineers need technical data and specifications. We know where contractors need practical installation guidance. We know where municipalities need long-term performance data and maintenance realities.

We speak all three languages. And we show up for all three conversations.

Contact us at https://interfaceh2o.com/

Site conditions change. Our team adapts. We are available to help assess and adjust in the field to keep progress moving...
06/10/2026

Site conditions change. Our team adapts. We are available to help assess and adjust in the field to keep progress moving forward.

Let’s troubleshoot it together. On-site. On time.

https://interfaceh2o.com/

Join Presto Geosystems Tuesday, June 9, 2026 for their live webinar: Introduction to the GEOWEB MSE Wall Design Software...
06/08/2026

Join Presto Geosystems Tuesday, June 9, 2026 for their live webinar: Introduction to the GEOWEB MSE Wall Design Software Exploring Value Engineered Solutions Using Geocells

Utilizing the GEOWEB® Geocell System for Cost and Time Efficiency

Date & Time:

Tuesday, June 9, 2026
11:00 AM – 12:00 PM CST

Free Webinar
Earn 1.0 PDH Credit

Presenter: Bryan Wedin, P.E., Chief Engineer

Budget overruns both in terms of cost and time are unfortunately common in today’s construction industry, primarily due to material shortages and tight deadlines. Public projects, in particular, face heightened scrutiny whenever overruns occur, often resulting in engineers and architects being held responsible for additional costs. While some issues can be quickly overcome as surprises, many delays can be anticipated with thorough research and market analysis during the design phase.

In this webinar, we will explore how the GEOWEB® Geocells can serve as a value-engineered solution to mitigate costly delays. Whether the GEOWEB system is implemented from the very beginning or adopted as a field solution after work has begun, it offers an innovative approach to reduce material costs and speed up installation time. The discussion will include a basic overview of the application types that the GEOWEB system can be used for, highlighting its flexible nature and suitability for challenging projects.

Additionally, project case studies will highlight the different ways the GEOWEB system can save both time and money, showcasing how Presto Geosystems is a leading expert in the geocell field. We will discuss when to consider value engineering your project and how to utilize the GEOWEB system to achieve a long-lasting, durable, and successful outcome without compromising quality.

Learning Objectives:

Understand when to consider Value Engineering can help ensure a project is both cost-effective and high quality. Value engineering can take place in the planning phase, design phase or after bids are received.

Learn how the innovative GEOWEB geocell system can meet the demands of a wide variety of projects, even if no other geosynthetics have a viable solution.

Gain tools and tips on how Presto Geosystems can assist in completing plan sets, bid packages, and specifying documents.

Register today: https://www.prestogeo.com/exploring-value-engineering-options-with-geocells/

All upcoming webinars:https://www.prestogeo.com/webcasts/

Municipal road reconstruction projects are where stormwater management, traffic management, and construction efficiency ...
06/04/2026

Municipal road reconstruction projects are where stormwater management, traffic management, and construction efficiency all have to work at the same time.

When we work with Michigan municipalities and their engineering consultants on road projects, we think through every phase.

Construction phase: FODS trackout control mats at all construction access points. SedSox and SedCatch inlet protection throughout the project corridor. Ground protection mats for equipment staging in soft shoulder areas.

Roadway stormwater management: PaveDrain for parking lanes, turnouts, and roadside parking areas where infiltration targets must be met. Fabco inlet inserts for water quality treatment at new catch basin installations.

Slope and ditch stabilization: Flexamat for outlet protection at cross-culverts and channel transitions. Presto geocells for slope stabilization at cut and fill sections.

Bank stabilization: CocoLogix for stream bank repair at road crossings and drainage outfalls.

From the first construction entrance to the final inspection, we have solutions for every phase.

Contact us at https://interfaceh2o.com/

stormwater

When you choose Interfaceh2o, you are not just buying a product. You are gaining a partner who shows up, steps in, and g...
06/03/2026

When you choose Interfaceh2o, you are not just buying a product. You are gaining a partner who shows up, steps in, and gets it done.

That is what boots on the ground looks like.

https://interfaceh2o.com/

We have been asked more than once: "Why would you recommend a product you do not sell?"Because our job is to solve your ...
06/02/2026

We have been asked more than once: "Why would you recommend a product you do not sell?"

Because our job is to solve your problem, not to close a sale.

Michigan engineers and contractors come to us because they know we will give them a straight answer. If your site conditions call for a solution outside our product portfolio, we will point you in the right direction. That kind of honesty is not common. It is what separates a vendor from a partner.

We are here to be your partner.

Learn more: https://interfaceh2o.com/

Address

Zeeland, MI
49464

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+16169315584

Alerts

Be the first to know and let us send you an email when Interfaceh2o posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share